For customers’ benefits
For customers’ benefits
Ready to start working after simple installation on site.With pre-installed coupling, liquid level device, water inlet and outlet pipe, air hole, cable, the lift station is ready to start working after simple installation on site. Many inlets are optional for different working conditions, and it saves a lot.
Be more reliable with high protective degree.The protective degree for whole sewage lift system meets IP68, and for intelligent pump controller, it meets IP54. The system can be installed either on the ground or under, and keeps working when submerged in water for a short time.
The least maintenance to keep its longest service life.Being anti-corrosive and pressure-resistant, PE tank enables the system services very long time, while little maintenance is required. Pump and intelligent controller comprise the electric system. It is stable and convenient, and ensures the LIFTS keep running for years.
The lowest cost to add equipment for sewage treatment.Compared with digging deep drainage pipeline or wells at outdoors, it is saves customer cost at max to apply a sewage lift station.
Be more reliable with high protective degree.The protective degree for whole sewage lift system meets IP68, and for intelligent pump controller, it meets IP54. The system can be installed either on the ground or under, and keeps working when submerged in water for a short time.
The least maintenance to keep its longest service life.Being anti-corrosive and pressure-resistant, PE tank enables the system services very long time, while little maintenance is required. Pump and intelligent controller comprise the electric system. It is stable and convenient, and ensures the LIFTS keep running for years.
The lowest cost to add equipment for sewage treatment.Compared with digging deep drainage pipeline or wells at outdoors, it is saves customer cost at max to apply a sewage lift station.